Commercial Facility Microgrid & Resilience Solver

Underwrite multi-asset on-site microgrids (Solar + BESS + GenSet), grid outage downtime cost mitigation, demand peak shaving, and 20-year net NPV.

Facility Load & Outage Risk

Annual Cost Avoidance & Payback

Annual Avoided Outage Downtime Losses
$630,000 / yr Saved
Annual Peak Demand Charge Utility Savings (40% Cut)
$70,200 / yr
Net Total Microgrid Annual Economic Benefit
$700,200 / yr Total Value
Microgrid Capital Payback (Post-30% Section 48 ITC)
1.25 Years Payback (80.0% ROI)